Formaldehyde from methanol a design report

This proposed formaldehyde plant will require a minimum of 27 pieces of principal process-equipment. The design is for a daily output of 20 tons per day of 37% formaldehyde, stabilized with 8% of methanol, according to standard product specifications. The minimum land area required is 114,200 sq. ft...

पूर्ण विवरण

ग्रंथसूची विवरण
मुख्य लेखक: Adriano, Zenaida S.
अन्य लेखक: Amoranto, Aurora T., Binoya, Cornelio, Jr
स्वरूप: थीसिस
भाषा:English
प्रकाशित: Quezon City College of Engineering 1961.
विषय: