Formaldehyde from methanol a design report
This proposed formaldehyde plant will require a minimum of 27 pieces of principal process-equipment. The design is for a daily output of 20 tons per day of 37% formaldehyde, stabilized with 8% of methanol, according to standard product specifications. The minimum land area required is 114,200 sq. ft...
Main Author: | |
---|---|
Other Authors: | , |
Resource Type: | Thesis |
Language: | English |
Published: |
Quezon City
College of Engineering
1961.
|
Subjects: |
College of Engineering Library II (UP Diliman)
Accession # | Call # | Volume/Part# | Copy # | Collection | Circulation Type | Circulation Status |
---|---|---|---|---|---|---|
E-12PD | LG 993 1961 E62 / A37 | COE Lib 2 Thesis and Archives Section | Room-use Only | On-Shelf |