Application of BIM as a visualization tool in falsework scheduling
The study aims to propose a methodology for visualizing the construction process using the Building Information Modeling (BIM) process. The proposed methodology is illustrated through a four-stage process: The structure is to be first modeled according to plan specifications in Autodesk Revit, then...
| Hovedforfatter: | |
|---|---|
| Andre forfattere: | |
| Format: | Thesis |
| Sprog: | English |
| Fag: |