The Relationship of the heat of hydration to the bored pile integrity of bored piles contaminated with soil during setting

Cast-in-place bored piles are the most popular used pile foundations for bridges, piers and tall structures having heavy loads. The current methodology in pile testing during construction of bored piles is costly and can only be done 28 days after the pouring of concrete. The aim of this study is to...