Evaluation of the optimum number, capacity, and location of tie-lines for the interconnection of Visayas and Mindanao

The Philippine electric power system is composed of the already interconnected Luzon and Visayas Grids, and the isolated Mindanao Grid. Plans for interconnection between the Visayas and Mindanao Grids are part of the Indicative Plans in the Transmission Development Plan 2010 of the National Grid Cor...

Täydet tiedot

Bibliografiset tiedot
Päätekijä: Mendoza, Jeramy Castro
Aineistotyyppi: Opinnäyte
Kieli:English
Julkaistu: 2011.
Aiheet: