Improving overall reliability of radial distribution systems through optimal lateral protection scheme
Whether the fuse in a distribution feeder is used in a fuse-blow or fuse-save scheme affects the reliability of the power distribution system. Fuse-blow schemes have higher SAIFI, SAIDI, EENS, ASIFI, and ASIDI because temporary faults result in sustained interruptions; fuse-save schemes yields lower...
| 1. Verfasser: | |
|---|---|
| Format: | Abschlussarbeit |
| Sprache: | English |
| Veröffentlicht: |
2011.
|
| Schlagworte: |