Theoretical and practical aspects of infiltration gallery planning and design.

The range of yields that may be expected through wet and dry periods is initially estimated for the candidate site. Alternative layouts of gallery pipes are configured in accordance with this range of yields. A groundwater flow model is employed to obtain the expected production rate for each altern...

詳細記述

書誌詳細
出版年:UPCOE NEC Technical Bulletin 2, 1 (October 2006).
第一著者: Castro, Peter M.
フォーマット: 論文
言語:English
主題: