A methods engineering study on Celdin Shoes MFG.

The different tools in Methods Engineering enabled the group to analyze the documented system of Celdin Shoes Mfg. The core problems were identified and prioritized as follows : (1) poor layout, (2) poor workstation design, and (3) lack of health and safety measures. Alternatives were presented for...

Description complète

Détails bibliographiques
Auteur principal: Casinto, Gerly D.
Autres auteurs: Fababeir, Sieglent F., Polina, Annah Karina D.
Format: Thèse
Langue:English
Publié: Diliman, Quezon City College of Engineering 2004
Sujets: