CVC Nickel Project Corporation a design project
Initial capital requirement: 63 million -- Operating capital (cash and inventory): 3.4 million -- Expected pay-out time: 4 years -- Capacity: 2,160,000 tons/year -- Sales at capacity: 65,243,520 -- Break-even point: 45% capacity -- Shut-down point: 3.96% capacity
| מחבר ראשי: | |
|---|---|
| מחברים אחרים: | , | 
| פורמט: | Thesis | 
| שפה: | English | 
| יצא לאור: | Diliman, Quezon City
          College of Engineering
    
        1971. | 
| נושאים: |