A Plant design for the manufacture of sulfated monoglyceride and diglyceride detergent bars
Capacity: 14 metric tons detergent/day -- Fixed capital investment: P 44,665,354.34 -- Annual sales at maximum production: P 50,414,400.00 -- Pay-out time: 3.91 years -- Break-even point: 65.057% of maximum production -- Shut-down point: 5.04% maximum production -- Percent return on investment: 15.5...
| Other Authors: | , , , |
|---|---|
| Format: | Thesis |
| Language: | English |
| Published: |
Quezon City
College of Engineering
1982.
|
| Subjects: |