Lemma, Inc. hydrogen peroxide plant

Capacity: 5 tons/24 hr-day -- Fixed capital investment: 14,612,540 -- Operating cost at maximum production: 2,705,054 -- Sales at maximum production: 4,940,000 -- Pay-off time: 4 years -- Break-even point: 2.8 tons/ 24 hr-day -- Plant location: Pasig, Rizal

Bibliografiske detaljer
Hovedforfatter: Cendaña, Emma Q.
Andre forfattere: Miravalles, Lemuel M.
Format: Thesis
Sprog:English
Udgivet: Diliman, Quezon City College of Engineering 1967.
Fag: