Lemma, Inc. hydrogen peroxide plant
Capacity: 5 tons/24 hr-day -- Fixed capital investment: 14,612,540 -- Operating cost at maximum production: 2,705,054 -- Sales at maximum production: 4,940,000 -- Pay-off time: 4 years -- Break-even point: 2.8 tons/ 24 hr-day -- Plant location: Pasig, Rizal
1. autor: | |
---|---|
Kolejni autorzy: | |
Format: | Praca dyplomowa |
Język: | English |
Wydane: |
Diliman, Quezon City
College of Engineering
1967.
|
Hasła przedmiotowe: |