Methane from organic waste
Capacity: 46,190 lbs/year -- Fixed capital investment: 825,551 -- Operating cost at maximum production: 165,400 -- Sales at maximum production: 480,000 -- Pay-off time: 2.18 years -- Break-even point: 40% capacity -- Shut-down point: 12.7% capacity
Main Author: | |
---|---|
Other Authors: | , |
Format: | Thesis |
Language: | English |
Published: |
Diliman, Quezon City
College of Engineering
[1965?].
|
Subjects: |