Feasibility study on the production of peanut milk
Plant design: Peanut milk -- Process: wet extraction method -- Capacity: 11 metric tons per day -- Plant location: Barrio Pantubigan, San Rafael, Bulacan -- Total land area: 4,000 sq.m. -- Pay-out period: 1.79 years -- Annual rate of return: 55.92% -- Product composition (weight percentage): Crude p...
| मुख्य लेखक: | |
|---|---|
| अन्य लेखक: | , |
| स्वरूप: | थीसिस |
| भाषा: | English |
| प्रकाशित: |
Quezon City
College of Engineering
1987.
|
| विषय: |