Optimizing scheduling of post-earthquake electric power restoration tasks.
This paper presents a stochastic integer program developed to determine how to schedule inspection, damage assessment, and repair tasks so as to optimize the post-earthquake restoration of the electric power system. The objective of the optimization is to minimize the average time each customer is w...
| Julkaisussa: | Earthquake engineering & structural dynamics. 36, 2 (2007). |
|---|---|
| Päätekijä: | |
| Aineistotyyppi: | Artikkeli |
| Kieli: | English |
| Aiheet: |