Optimizing scheduling of post-earthquake electric power restoration tasks.

This paper presents a stochastic integer program developed to determine how to schedule inspection, damage assessment, and repair tasks so as to optimize the post-earthquake restoration of the electric power system. The objective of the optimization is to minimize the average time each customer is w...

תיאור מלא

מידע ביבליוגרפי
הוצא לאור ב:Earthquake engineering & structural dynamics. 36, 2 (2007).
מחבר ראשי: Xu, Ningxiong
פורמט: Article
שפה:אנגלית
נושאים: