Optimizing scheduling of post-earthquake electric power restoration tasks.
This paper presents a stochastic integer program developed to determine how to schedule inspection, damage assessment, and repair tasks so as to optimize the post-earthquake restoration of the electric power system. The objective of the optimization is to minimize the average time each customer is w...
| Veröffentlicht in: | Earthquake engineering & structural dynamics. 36, 2 (2007). |
|---|---|
| 1. Verfasser: | |
| Format: | Artikel |
| Sprache: | English |
| Schlagworte: |