Five methods of changing fixed-time signal plans

Sonraí bibleagrafaíochta
Príomhchruthaitheoir: Bretherton, R. D.
Formáid: LEABHAR
Teanga:English
Foilsithe / Cruthaithe: Crowthorne, [Eng.] Urban Networks Division, Traffic Engineering Dept., Transport and Road Research Laboratory 1979.
Sraith:TRRL laboratory report 879