An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints.
Discusses a scheduling technique, for cluster tools, that addresses postprocessing residency constraints and throughput requirements. The residency constraints impose a limit on the postprocessing time that a material unit spends in a processing module. The technique searches in the time and resourc...
| Argitaratua izan da: | IEEE Transactions on robotics and automation 17, 5 (2001). |
|---|---|
| Egile nagusia: | |
| Formatua: | Artikulua |
| Hizkuntza: | ingelesa |
| Gaiak: |