Long-term thermal power planning at VEW ENERGIE using a multi-interval Bloom and Gallant method.
Bloom and Gallant have proposed an elegant model for finding the optimal thermal schedule subject to matching the load duration curve and general linear constraints. Their method is based on a linear program with some linear equality constraints and many linear inequality constraints. There are well...
| Published in: | IEEE Transactions on power systems 16, 1 (2001). |
|---|---|
| Main Author: | |
| Format: | Article |
| Language: | English |
| Subjects: |