World's first commercial bridge capacitor bank installation on the American Electric Power System.

The paper presents some of the engineering aspects of the first commercial installation of a bridge capacitor bank on the American Electric Power System. System performance and the economic aspects of the installation, which went in service on November 1998, are also discussed

書誌詳細
出版年:IEEE Transactions on power delivery 16, 2 (2001).
第一著者: Andrei, R.G
フォーマット: 論文
言語:英語
主題: