World's first commercial bridge capacitor bank installation on the American Electric Power System.

The paper presents some of the engineering aspects of the first commercial installation of a bridge capacitor bank on the American Electric Power System. System performance and the economic aspects of the installation, which went in service on November 1998, are also discussed

Bibliografiska uppgifter
I publikationen:IEEE Transactions on power delivery 16, 2 (2001).
Huvudupphovsman: Andrei, R.G
Materialtyp: Artikel
Språk:English
Ämnen: