Mindanao needs 500 MW in non-hydro power capacity DOE eyeing coal fired plants to meet requirement. IN Mindanao News.
| 发表在: | Philippine Daily Inquirer Ja-D, Mon-Sat (2010). |
|---|---|
| 主要作者: | |
| 格式: | 文件 |
| 语言: | English |
| 主题: |
| 发表在: | Philippine Daily Inquirer Ja-D, Mon-Sat (2010). |
|---|---|
| 主要作者: | |
| 格式: | 文件 |
| 语言: | English |
| 主题: |