Mindanao needs 500 MW in non-hydro power capacity DOE eyeing coal fired plants to meet requirement. IN Mindanao News.
| में प्रकाशित: | Philippine Daily Inquirer Ja-D, Mon-Sat (2010). | 
|---|---|
| मुख्य लेखक: | |
| स्वरूप: | लेख | 
| भाषा: | English | 
| विषय: | 
| में प्रकाशित: | Philippine Daily Inquirer Ja-D, Mon-Sat (2010). | 
|---|---|
| मुख्य लेखक: | |
| स्वरूप: | लेख | 
| भाषा: | English | 
| विषय: |