Re-engineering Iraq [power production shortage].
This paper examines the reasons why, after three years of continuous support from the US government to reconstruct the electrical infrastructure in war-torn Iraq, there is still a shortage of about 4000 MW in the country's power production. The paper cites a variety of reasons that include the...
| Foilsithe in: | IEEE spectrum 43, 2 (2006). |
|---|---|
| Príomhchruthaitheoir: | |
| Formáid: | Alt |
| Teanga: | Béarla |
| Ábhair: |