Unit commitment risk assessment of interruptible loads in the operating reserve of Luzon grid
Load interruptions form part of a scheme in a power system which enables the grid to recover from a deteriorating frequency resulting from an outage of a generating facility or transmission line/ equipment. Load interruptions can also be used as a part of the total operational reserve of a sys...
| Главный автор: | |
|---|---|
| Формат: | Диссертация |
| Язык: | English |
| Опубликовано: |
2009.
|
| Предметы: |