Unit commitment risk assessment of interruptible loads in the operating reserve of Luzon grid

Load interruptions form part of a scheme in a power system which enables the grid to recover from a deteriorating frequency resulting from an outage of a generating facility or transmission line/ equipment. Load interruptions can also be used as a part of the total operational reserve of a sys...

पूर्ण विवरण

ग्रंथसूची विवरण
मुख्य लेखक: Mendoza, Oliver G.
स्वरूप: थीसिस
भाषा:English
प्रकाशित: 2009.
विषय: