Original equipment manufacturers, Inc. a methods study
The group hopes to improve productivity of the study by reducing the work content. Wasted effort is reduced by integrating activities-in the base assembly, the circuitous transport and operation activities of going to the cutter and back is totally eliminated by cutting beforehand ashlars into speci...
| 其他作者: | , , , , , |
|---|---|
| 格式: | Thesis |
| 语言: | English |
| 出版: |
Diliman, Quezon City
College of Engineering
1989
|
| 主题: |