1 - 10 toradh á dtaispeáint as 28 toradh san iomlán ar an gcuardach '', am iarratais: 0.02s Beachtaigh na torthaí
  1. 1
  2. 2
  3. 3
  4. 4

    Slope stability and stabilization methods

    Foilsithe / Cruthaithe 2002
    LEABHAR
  5. 5

    Instrumentation of transportation embankments constructed on soft ground.

    Foilsithe / Cruthaithe 1995
    LEABHAR
  6. 6

    Mechanically stabilized earth walls

    Foilsithe / Cruthaithe 1995
    LEABHAR
  7. 7

    Construction robotics and automation, and foundations engineering

    Foilsithe / Cruthaithe 1993
    LEABHAR
  8. 8

    Segmental concrete MSE walls, geogrid reinforcements, and soil nailing

    Foilsithe / Cruthaithe 1993
    LEABHAR
  9. 9

    Lightweight artificial and waste materials for embankments over soft soils.

    Foilsithe / Cruthaithe 1993
    LEABHAR
  10. 10

    Treatment of problem foundations for highway embankments de réir Holtz, R. D.

    Foilsithe / Cruthaithe 1989
    LEABHAR