Design of 3-22kV 70MVA aboveground substations and installation of electrical equipment for Phase 1 of the Jurong Rock Cavern Project

The 22 kV switchgear assembly is GIS Design and construction with metal clad enclosure and fixed type circuit breaker. Each of the 22kV outgoing circuit breakers is complete with an earthing switch with interlock such that when the circuit breaker is close, the earthing switch shall be un able to cl...