Control charts for simultaneous monitoring of unknown mean and variance of normally distributed process.
Phase II Shewhart-type control charts are considered for simultaneous monitoring of the mean and variance of a normally distributed process when both of these parameters are unknown and are estimated from an in-control (IC) Phase I reference sample. The charts are based on single plotting statistics...
| Published in: | Journal of Quality Technology 45, 4 (2013). |
|---|---|
| Main Author: | |
| Format: | Article |
| Language: | English |
| Subjects: |