Evaluation of the optimum number, capacity, and location of tie-lines for the interconnection of Visayas and Mindanao

The Philippine electric power system is composed of the already interconnected Luzon and Visayas Grids, and the isolated Mindanao Grid. Plans for interconnection between the Visayas and Mindanao Grids are part of the Indicative Plans in the Transmission Development Plan 2010 of the National Grid Cor...

Mô tả đầy đủ

Chi tiết về thư mục
Tác giả chính: Mendoza, Jeramy Castro
Định dạng: Luận văn
Ngôn ngữ:English
Được phát hành: 2011.
Những chủ đề: