A Methods engineering study on Moonbake, Inc.
Moonbake is currently operating for 24 hours with 2 shifts (each shift having twelve working hours) to sustain the market's demand on chocolate crinkles. This resulted from some problems on their operation proper. Based on the data gathered by the group through frequent plant visits and on the...
| 第一著者: | |
|---|---|
| その他の著者: | , |
| フォーマット: | 学位論文 |
| 言語: | English |
| 出版事項: |
Diliman, Quezon City
College of Engineering
2005
|
| 主題: |