The Conversion of sludge into utilizable gas

Capacity: 1,909,315 lbs/year -- Fixed capital investment: 3,039,021 -- Operating costs at maximum production: 1,551,767.46 -- Sales at maximum production: 1,909,315 -- Pay-off time: 4.56 years -- Break-even point: 45% capacity -- Shut down point: 7% capacity

Detaylı Bibliyografya
Yazar: Lastrilla, Evelina
Diğer Yazarlar: Abesamis, Luz Grace, Militar, Edward
Resource Type: Tez
Dil:English
Baskı/Yayın Bilgisi: Diliman, Quezon City College of Engineering 1978.
Konular:

College of Engineering Library II (UP Diliman)

Accession # Call # Volume/Part# Copy # Collection Circulation Type Circulation Status
E-167PD LG 993 1978 E62 / L37 COE Lib 2 Thesis and Archives Section Room-use Only On-Shelf