The Conversion of sludge into utilizable gas
Capacity: 1,909,315 lbs/year -- Fixed capital investment: 3,039,021 -- Operating costs at maximum production: 1,551,767.46 -- Sales at maximum production: 1,909,315 -- Pay-off time: 4.56 years -- Break-even point: 45% capacity -- Shut down point: 7% capacity
Autor principal: | |
---|---|
Outros Autores: | , |
Resource Type: | Tese |
Idioma: | English |
Publicado em: |
Diliman, Quezon City
College of Engineering
1978.
|
Assuntos: |
College of Engineering Library II (UP Diliman)
Accession # | Call # | Volume/Part# | Copy # | Collection | Circulation Type | Circulation Status |
---|---|---|---|---|---|---|
E-167PD | LG 993 1978 E62 / L37 | COE Lib 2 Thesis and Archives Section | Room-use Only | On-Shelf |