Optimizing scheduling of post-earthquake electric power restoration tasks.
This paper presents a stochastic integer program developed to determine how to schedule inspection, damage assessment, and repair tasks so as to optimize the post-earthquake restoration of the electric power system. The objective of the optimization is to minimize the average time each customer is w...
| Τόπος έκδοσης: | Earthquake engineering & structural dynamics. 36, 2 (2007). |
|---|---|
| Κύριος συγγραφέας: | |
| Μορφή: | Άρθρο |
| Γλώσσα: | English |
| Θέματα: |