Optimizing scheduling of post-earthquake electric power restoration tasks.

This paper presents a stochastic integer program developed to determine how to schedule inspection, damage assessment, and repair tasks so as to optimize the post-earthquake restoration of the electric power system. The objective of the optimization is to minimize the average time each customer is w...

Celý popis

Podrobná bibliografie
Vydáno v:Earthquake engineering & structural dynamics. 36, 2 (2007).
Hlavní autor: Xu, Ningxiong
Médium: Článek
Jazyk:English
Témata: