Seismic retrofit of George Massey Tunnel.
The 629 m long immersed George Massey Tunnel passes nder the south arm of the Fraser River near Vancouver, British Columbia. The tunnel was completed in 1959. Based on current seismic design standards, the precast concrete structure is grossly under-reinforced in the longitudinal direction. Buckland...
Published in: | Earthquake engineering & structural dynamics. 34, 4-5 (2005). |
---|---|
Main Author: | |
Format: | Article |
Language: | English |
Subjects: |