Production scheduling in a semiconductor wafer fabrication facility producing multiple product types with distinct due dates.

Focuses on production scheduling in a semiconductor wafer fab producing multiple product types that have different due dates and different process flows. In the wafer fab, wafer lots are processed on serial and batch processing workstations, each of which consists of parallel identical machines. Mac...

תיאור מלא

מידע ביבליוגרפי
הוצא לאור ב:IEEE Transactions on robotics and automation 17, 5 (2001).
מחבר ראשי: Yeong-Dae Kim
פורמט: Article
שפה:English
נושאים: