World's first commercial bridge capacitor bank installation on the American Electric Power System.

The paper presents some of the engineering aspects of the first commercial installation of a bridge capacitor bank on the American Electric Power System. System performance and the economic aspects of the installation, which went in service on November 1998, are also discussed

Detalles Bibliográficos
Publicado en:IEEE Transactions on power delivery 16, 2 (2001).
Autor principal: Andrei, R.G
Formato: Artículo
Lenguaje:English
Materias: