World's first commercial bridge capacitor bank installation on the American Electric Power System.

The paper presents some of the engineering aspects of the first commercial installation of a bridge capacitor bank on the American Electric Power System. System performance and the economic aspects of the installation, which went in service on November 1998, are also discussed

Chi tiết về thư mục
Xuất bản năm:IEEE Transactions on power delivery 16, 2 (2001).
Tác giả chính: Andrei, R.G
Định dạng: Bài viết
Ngôn ngữ:English
Những chủ đề: