Unit commitment risk assessment of interruptible loads in the operating reserve of Luzon grid

Load interruptions form part of a scheme in a power system which enables the grid to recover from a deteriorating frequency resulting from an outage of a generating facility or transmission line/ equipment. Load interruptions can also be used as a part of the total operational reserve of a sys...

詳細記述

書誌詳細
第一著者: Mendoza, Oliver G.
フォーマット: 学位論文
言語:English
出版事項: 2009.
主題: