Poly-logarithmic deterministic fully-dynamic algorithms for connectivity, minimum spanning tree, 2-edge, and biconnectivity.

Deterministic fully dynamic graph algorithms are presented for connectivity, minimum spanning tree, 2-edge connectivity, and biconnectivity. Assuming that we start with no edges in a graph with n vertices, the amortized operation costs are O(log2 n) for connectivity, O(log4 n) for minimum spanning f...

Полное описание

Библиографические подробности
Опубликовано в::Journal of the ACM 48, 4 (2001).
Главный автор: Holm, Jacob
Формат: Статья
Язык:English
Предметы: