Solution to the unit commitment and economic dispatch problem of Luzon grid to optimize NPC and Meralco bilateral contracts with independent power producers

The price of electricity is dependent on the costs of operation of the power system. On the generation sector, production costs are mostly in the form of fuel costs for the operation of the generators. Fuel costs alone would oftentimes comprise about eighty to ninety percent of the total operation c...

Volledige beschrijving

Bibliografische gegevens
Hoofdauteur: Basa, Joris Noel P.
Formaat: Thesis
Taal:English
Gepubliceerd in: 2004.
Onderwerpen: