Original equipment manufacturers, Inc. a methods study
The group hopes to improve productivity of the study by reducing the work content. Wasted effort is reduced by integrating activities-in the base assembly, the circuitous transport and operation activities of going to the cutter and back is totally eliminated by cutting beforehand ashlars into speci...
| مؤلفون آخرون: | , , , , , |
|---|---|
| التنسيق: | أطروحة |
| اللغة: | English |
| منشور في: |
Diliman, Quezon City
College of Engineering
1989
|
| الموضوعات: |