A solution to unit commitment problem for small island grid with intermittent wind power supply
It is difficult to operate s system economically if the power supply and load demand are varying, one of which is a Small Island Grid with intermittent wind power supply. This problem combined with physical and operating constraints is a Unit Commitment problem. A method using Autoregressive Modelin...
| Autor principal: | |
|---|---|
| Formato: | Tese |
| Idioma: | English |
| Publicado em: |
2002.
|
| Assuntos: |